Development Projects
Reimagining our campuses
By reimagining our campuses, we will create an experience that connects us with society and our communities.
Our campuses will be digitally enabled, environmentally responsible, safe, vibrant, and accessible, adding a new dimension of engagement and collaboration.
We want to create spaces, places and platforms that inspire, retain, and attract the best and brightest in their field while creating an outstanding student experience.
Our current projects
Central Coast Campus
Read more
City Campus Student Accommodation
Read more
Health Education Research Building
Read more
University House
Read more
Alumni House
Read more
Health and Physical Education Building
Read more
Public Notifications
In accordance with DA conditions, the following documents are publicly accessible.
City Campus
Concept Plan
- Design Excellence Strategy (PDF, 796.4 KB)
- Revised Concept Plans (PDF, 9.7 MB)
- Supporting Solar Access Analysis (PDF, 9.7 MB)
- Secretarys letter UoN Honeysuckle Campus (PDF, 209.0 KB)
- Revised Design Guidelines (Nov 2023) (PDF, 12.2 MB)
For further information on the City Concept Plan, please visit the NSW Planning Portal.
Q Building (complete)
- Architectural Drawings (PDF, 7.0 MB)
- Civil and Stormwater Plans (PDF, 1.8 MB)
- Landscape Drawings (PDF, 7.1 MB)
- SSD 9510 - Assessment Report (PDF, 2.1 MB)
- SSD 9510 - Development Consent (PDF, 396.2 KB)
- SSD 9510 - Notice of Decision (PDF, 161.1 KB)
- Subsidence Advisory NSW Consent (PDF, 494.0 KB)
- DA2018-00933 – Enabling Works DA Consent (PDF, 417.5 KB)
- DA2019-00138 – Mine Grouting DA Consent (PDF, 276.2 KB)
- Environmental Impact Statement (PDF, 3.6 MB)
- Response to Submissions (PDF, 1.2 MB)
- Appendix A - Design Report (PDF, 10.9 MB)
- Appendix B - Architectural Plans (PDF, 10.7 MB)
- Appendix C - SEARs (PDF, 79.9 KB)
- Appendix D - Survey Plan (PDF, 1.6 MB)
- Appendix E - CIV Report (PDF, 142.3 KB)
- Appendix F - Schematic Design ESD Report (PDF, 6.3 MB)
- Appendix G - Heritage Impact Statement (PDF, 6.7 MB)
- Appendix H - Aboriginal Cultural Heritage Assessment Report (PDF, 13.0 MB)
- Appendix I - Biodiversity Assessment Waiver (PDF, 4.7 MB)
- Appendix J - Subsidence Advisory NSW Approval (PDF, 494.0 KB)
- Appendix K - CPTED Report (PDF, 1.6 MB)
- Appendix L - Preliminary Construction Management Plan (PDF, 3.2 MB)
- Appendix M - BCA and Access Report (PDF, 530.0 KB)
- Appendix N - Stormwater and Servicing Report (PDF, 20.3 MB)
- Appendix O - Consultation Outcomes Report (PDF, 1.7 MB)
- Appendix P - Parking and Transport Assessment (PDF, 4.7 MB)
- Appendix Q - Green Travel Plan (PDF, 2.3 MB)
- Appendix R - Acoustic Report (PDF, 9.9 MB)
- Appendix S - Construction Traffic Management Plan (PDF, 2.0 MB)
- Appendix T - Servicing and Waste Report (PDF, 2.5 MB)
- Appendix U - Detailed Site Investigation (PDF, 32.2 MB)
- Appendix V - Pedestrian Wind Environment Study (PDF, 559.2 KB)
- Appendix W - Infrastructure (Light Rail) and Utilities Assessment (PDF, 151.8 KB)
- Appendix X - Remedial Action Plan (PDF, 2.0 MB)
- Appendix Y - Landscape Plans (PDF, 4.3 MB)
- Attachment A - Response to Submission Table (PDF, 289.2 KB)
- Attachment B - Amended Plans (Clouded) (PDF, 9.1 MB)
- Attachment B - Amended Plans (For Approval) (PDF, 9.8 MB)
- Attachment C - Design Excellence Statement (PDF, 1.8 MB)
- Attachment D - Amended Landscape Plans (PDF, 8.6 MB)
- Attachment E - Lighting Impact Assessment (PDF, 4.9 MB)
- Attachment F - Amended NVIA (PDF, 9.9 MB)
- Attachment G - Preliminary CMP (PDF, 10.1 MB)
- Attachment H - Wind Environment Statement (PDF, 1.1 MB)
- Attachment I - Design Response to NSWGA (PDF, 3.6 MB)
- Attachment J - Civil Engineering Response (PDF, 163.5 KB)
- Attachment K - Civil Works Plan (PDF, 2.0 MB)
- Attachment L - Enabling Works Plan (PDF, 1.8 MB)
- Attachment M - Traffic Response (PDF, 220.9 KB)
- Attachment N - Public Domain Cost Plan (PDF, 317.6 KB)
- Construction Environmental Management Plan (PDF, 13.2 MB)
- Construction Traffic and Pedestrian Management Sub-Plan (PDF, 9.7 MB)
- Construction Noise and Vibration Management Sub-Plan (PDF, 284.0 KB)
- Construction Waste Management Sub-Plan (PDF, 424.3 KB)
- Construction Soil and Water Management Sub-Plan (PDF, 947.0 KB)
- Flood Emergency Response Sub-Plan (PDF, 1.6 MB)
- Landscape-Maintenance-Plan (PDF, 1.2 MB)
- Mosquito-Management-Plan (PDF, 1.9 MB)
- Operational-Waste-Management-Plan (PDF, 2.3 MB)
- Operational-Flood-Emergency-Management-Plan (PDF, 2.4 MB)
- Operational Report (PDF, 4.5 MB)
- Pre Operational Report (PDF, 4.5 MB)
- Short Term Noise Monitoring (PDF, 278.2 KB)
- Independent Environmental Audit Program (PDF, 759.4 KB)
- Reporting and Compliance Pre-Construction V2 (PDF, 1.4 MB)
- Reporting and Compliance Program (PDF, 1.4 MB)
- Independent-Environmental-Audit-August.pdf (PDF, 11.2 MB)
- Independent-Environmental-Audit-December.pdf (PDF, 9.7 MB)
- Reporting and Compliance Construction V3.pdf (PDF, 3.7 MB)
- Proponent Response to Operational Audit 3 February 2023 (PDF, 122.5 KB)
- Independent Environmental Audit December 2022 (PDF, 5.7 MB)
- Proponent-Response-to-Audit-Aug-20.pdf (PDF, 103.6 KB)
- Proponent-Response-to-Audit-Dec-20.pdf (PDF, 109.6 KB)
- Q-Building-Operational-Compliance-Report-01.pdf (PDF, 4.5 MB)
- Q-Building-Operational-Compliance-Report-02.pdf (PDF, 2.4 MB)
- Q-Building-Pre-Operational-Compliance-Report.pdf (PDF, 4.5 MB)
- Complaints-Register.pdf (PDF, 101.8 KB)
Bioresources Facility
- Bioresources Facility – Independent Environmental Operational Audit Report, 2022 (PDF, 5.3 MB)
- Bioresources Facility – Non-compliance Action Table (PDF, 130.6 KB)
- Bioresources Facility – Noise Assessment (PDF, 213.9 KB)
- Bioresources Facility – Compliance Report (PDF, 107.2 KB)
- Bioresources Facility – Operational Compliance Report (PDF, 3.4 MB)
- Approved Plans (PDF, 3.4 MB)
- Notice of Determination Letter to Applicant (PDF, 94.8 KB)
- Assessment Report (PDF, 2.3 MB)
- Development Consent (PDF, 1.5 MB)
- 03.-Appendix-2-Aerial-Photo.pdf.pdf (PDF, 746.9 KB)
- 05.-Appendix-4-Survey-prepared-by-de-Witt.pdf.pdf (PDF, 5.1 MB)
- 06.-Appendix-5-05A_Architect-Drawings.pdf.pdf (PDF, 9.1 MB)
- 08.-Appendix-7-Geotechnical-Report.pdf.pdf (PDF, 6.8 MB)
- 10.-Appendix-8B-BDAR-Waiver-Approval_DPE.pdf.pdf (PDF, 74.9 KB)
- 11.-Appendix-8C-BDAR-Approval_OEH.pdf.pdf (PDF, 2.5 MB)
- 16.-Appendix-13-Noise-Report.pdf.pdf (PDF, 2.0 MB)
- 17.-Appendix-14-Traffic-Report.pdf.pdf (PDF, 458.8 KB)
- 20.-Appendix-17A-Erosion-and-Sediment-Control-Plan.pdf.pdf (PDF, 370.7 KB)
- 22.-Appendix-18-Concept-Stormwater-Plan.pdf.pdf (PDF, 845.3 KB)
- 25.-Appendix-20-Formal-Requirements.pdf.pdf (PDF, 196.3 KB)
- 28.-Appendix-21-NCC-consultation.pdf.pdf (PDF, 51.9 KB)
- 29.-Appendix-21-Ntle-Council-response.pdf.pdf (PDF, 77.4 KB)
- 30.-Appendix-21-RMS-consultation.pdf.pdf (PDF, 52.0 KB)
- 32.-Appendix-21-TfNSW-consultation.pdf.pdf (PDF, 52.0 KB)
- 33.-Appendix-21-TfNSW_response.pdf.pdf (PDF, 339.8 KB)
- 061.-Appendix-5-05B_Architect-Drawings.pdf.pdf (PDF, 8.7 MB)
- 062.-Appendix-5-05C_Architect-Drawings.pdf.pdf (PDF, 12.2 MB)
- 063.-Appendix-5-05D_Architect-Drawings.pdf.pdf (PDF, 9.0 MB)
- 2018-06-06-011F_Prelim-Site-Investigation_-Universit....pdf (PDF, 7.6 MB)
- 2018-06-06-011I_Prelim-Site-Investigation_-Universit....pdf (PDF, 5.3 MB)
- 2018-09-25-App1_Material-Safety-Data-Sheets-1.pdf.pdf (PDF, 384.9 KB)
- 2018-09-25-App1_Material-Safety-Data-Sheets-4.pdf.pdf (PDF, 44.8 KB)
- 2018-09-25-App1_Material-Safety-Data-Sheets-5.pdf.pdf (PDF, 64.5 KB)
- 2018-09-25-App3_Erosion-and-Sediment-Control.pdf.pdf (PDF, 556.4 KB)
- 2018-09-25-App4_Updated-Bushfire-Report.pdf.pdf (PDF, 4.4 MB)
- 2018-09-25-App8_Odour-Modelling.pdf.pdf (PDF, 133.3 KB)
- 2018-09-25-App9_Architectural-Plans.pdf.pdf (PDF, 1.2 MB)
- 2018-09-25-App11_mitigation-measures.pdf.pdf (PDF, 170.7 KB)
- 2018-09-25-Response-to-Submissions-Report.pdf.pdf (PDF, 785.9 KB)
- Attachment2_LANDSCAPE-OVERALL-PLAN-_1_.pdf.pdf (PDF, 1.1 MB)
- Attachment3_Amendment-to-Tree-report-.pdf.pdf (PDF, 79.3 KB)
- Attachment4_BCA.pdf.pdf (PDF, 2.9 MB)
- Attachment5_Access-Report.pdf.pdf (PDF, 492.6 KB)
- Attachment7_Floor-Layout-Plan_-External-Lighting.pdf.pdf (PDF, 4.6 MB)
- Attachment8_FACADE-TYPES.pdf.pdf (PDF, 320.7 KB)
- 102.-Appendix-5-Architect-Drawings-Part-3.pdf (PDF, 3.7 MB)
- Graphite-Projects-Tender-Submission-UON-Auchmuty-L3-compressed (PDF, 10.6 MB)
- B15-Environmental-Management-Plan.pdf (PDF, 1.6 MB)
- B16-Construction-Environmental-Management-Plan-UoN-Bio-Resources.pdf (PDF, 1.1 MB)
- B18-CPTMP-Bio-Resource-Building.pdf (PDF, 4.1 MB)
- B19-Noise-and-Vibration-Management-Plan.pdf (PDF, 2.2 MB)
- B20-Construction-Waste-Management-Plan.pdf (PDF, 317.6 KB)
- B21-Soil-and-Water-Management-Plan.pdf (PDF, 1.2 MB)
- Bioresources-Facility-Construction-Compliance-Report-01.pdf (PDF, 1019.6 KB)
- Bioresources-Facility-Construction-Compliance-Report-02.pdf (PDF, 1.1 MB)
- Bioresources-Facility-Operational-Compliance-Report-01.pdf (PDF, 3.4 MB)
- Bioresources-Facility-Pre-Construction-Compliance-Report.pdf (PDF, 452.3 KB)
- Independant-Environmental-Audit-01-incl-response.pdf (PDF, 4.6 MB)
- Independant-Environmental-Audit-02-Response.pdf (PDF, 196.5 KB)
- Independant-Environmental-Audit-02.pdf (PDF, 2.8 MB)
- Independant-Environmental-Audit-03-Operational-Response.pdf (PDF, 130.6 KB)
- Independant-Environmental-Audit-03-Operational.pdf (PDF, 5.7 MB)
- University-of-Newcastle-Bioresources-Facilities-Noise-Assessment.pdf (PDF, 0 Bytes)
- Biresources-Facility-Operational-Compliance-Report-02 (PDF, 6.3 MB)
- Complaint-Register.pdf (PDF, 42.6 KB)
Central Coast Campus
- Environmental Impact Statement (PDF, 6.6 MB)
- Appendix D - Traffic and Parking Response & Updated Assessment (PDF, 1.7 MB)
- Appendix F - Aboriginal Cultural Heritage Response to Submissions (PDF, 143.3 KB)
- Appendix G - Amended ACHAR (PDF, 7.2 MB)
- Appendix H - Archaeological Research Design and Evacuation Methodology (PDF, 2.3 MB)
- Appendix I - Acid Sulfate Soils Management Plan (PDF, 2.6 MB)
- Appendix J - Dewatering Management Plan (PDF, 4.8 MB)
- Submissions Report - Central Coast Campus (PDF, 475.1 KB)
- UON CCC BCA Capability Statement (PDF, 529.6 KB)
- Access Report Gosford (PDF, 1.6 MB)
- Visual Impact Assessment (PDF, 8.8 MB)
- CPTED University of Newcastle - Gosford Campus (PDF, 2.6 MB)
- Preliminary Arboricultural Report (PDF, 5.8 MB)
- NEW ESD REP SSDA (PDF, 911.6 KB)
- GCCD Green Travel Plan Draft (PDF, 1.6 MB)
- Environmental Acoustic Assessment UON Gosford (PDF, 6.3 MB)
- UON Gosford Geotech (PDF, 14.2 MB)
- Mann St Detailed Site Investigation Final (PDF, 24.4 MB)
- University of Newcastle Central Coast Campus Rev B (PDF, 768.1 KB)
- Mann St Gosford Hazardous Materials Survey (PDF, 5.8 MB)
- University of Newcastle Central Coast Campus, Gosford Rev B (PDF, 1.6 MB)
- Heritage Impact Statement (PDF, 6.8 MB)
- University of Newcastle HAIA D02 (PDF, 6.8 MB)
- Gosford Infrastructure Report (PDF, 2.0 MB)
- Stamped Plans - Part 1 of 4 (PDF, 13.4 MB)
- Stamped Plans - Part 2 of 4 (PDF, 15.4 MB)
- Stamped Plans - Part 3 of 4 (PDF, 9.1 MB)
- Stamped Plans - Part 4 of 4 (PDF, 13.1 MB)
- WE Report (PDF, 5.0 MB)
- 3.-Mar-24-Environmental-Compliance.pdf (PDF, 77.6 KB)
- 3.-Mar-24-Progress-Update.pdf (PDF, 104.0 KB)
- 12.-Appendix-J-Dewatering-Management-Plan-Rev1.pdf (PDF, 4.7 MB)
- 3. Mar-24 - Complaints Register (PDF, 196.0 KB)
- Assessment Report (PDF, 2.0 MB)
- Instrument of Consent (PDF, 545.2 KB)
- Notice of Decision (PDF, 166.1 KB)
- Stamped Plans - Part 1 of 4 (PDF, 13.4 MB)
- Stamped Plans - Part 2 of 4 (PDF, 15.4 MB)
- Stamped Plans - Part 3 of 4 (PDF, 9.1 MB)
- Stamped Plans - Part 4 of 4 (PDF, 13.1 MB)
- Hoarding Determination (PDF, 1.9 MB)
- Plan Approval Letter Central Coast Council (PDF, 536.0 KB)
- Road Occupancy Licence (PDF, 1.4 MB)
- Feb 24 - Progress Update (PDF, 103.0 KB)
- Feb-24 - Environmental Compliance (PDF, 84.9 KB)
- Feb-24 Complaints Register (PDF, 55.8 KB)
- CC B21 - CEMP - Rev2 w Appendicies (PDF, 14.7 MB)
- CC B25 - CNVMP (PDF, 1.0 MB)
- Unexpected Finds Protocol UoN Gosford (PDF, 2.2 MB)
- B2 and B3 Secretarys Waiver Letter (PDF, 126.1 KB)
- Director Response B2 Waiver Request (PDF, 132.0 KB)
- Stamped Sewer Design Plan (PDF, 6.4 MB)
- Feb-24 CCC - Staging Report Final Rev2 (PDF, 1.9 MB)
- CEMP - Rev2 w Appendicies (PDF, 14.7 MB)
- HSE Inspection (PDF, 213.9 KB)
- Environmental Compliance (PDF, 53.3 KB)
- Complaints Register (PDF, 36.6 KB)
- Staging Report Final (PDF, 2.9 MB)
- Jan-24 - Progress Update (PDF, 100.2 KB)
The University of Newcastle acknowledges the traditional custodians of the lands within our footprint areas: Awabakal, Darkinjung, Biripai, Worimi, Wonnarua, and Eora Nations. We also pay respect to the wisdom of our Elders past and present.